Automatic Deformation Monitoring System
- Date: 2014-2015
- Budget: $2 MM
- Partner: IPGG SB RAS
Industrial Geodetic Systems R&D participated in the deployment of a data collection and processing system that provides comprehensive monitoring, forecasting and condition management of the booster compressor station’s geotechnical system at the complex gas preparation facility (CPF-AB1). The plant serves Urengoy–Pomary–Uzhgorod pipeline (also known as the West-Siberian Pipeline, or Trans-Siberian Pipeline) — one of Russia's main natural gas export pipelines, partially owned and operated by Ukraine.
The project was implemented in collaboration with West-Siberian branch of the Federal State Budgetary Scientific Institution “Trofimuk Institute of Petroleum Geology and Geophysics of Siberian Branch of Russian Academy of Sciences” (IPGG SB RAS).